This performance deserves some extra attention!
Our recycling unit R2000E and storage unit ST1200E are a great combination. Recently we received some nice footage and feedback from our customer.
We value feedback from our customers! We use their experience to optimize our products. Our customer FTCS Forage recently completed a 200 meter crossing using a SiteTec recycling unit -R2000E- placed on a storage unit -ST2000E- in their setup. The crossing was successfully completed in mainly chalk and some limestone with a final 28” (711mm) reaming stage pulling a bundle totalling just under 500mm, all done with their 80 Ton Prime Drilling rig. We congratulate FCTS Forage with this succesfull performance!
Check the video below with the results!
In this video you’ll see a SiteTec recycling unit -R2000E- placed on a storage unit -ST2000E- in their setup.
FTCS Forage has been specialising in directional drilling, augering, hydrocuring or sheet piling for over 20 years. They use a special combination of SiteTec HDD Equipment. Namely SiteTec recycling unit R2000E and storage unit ST1200E.
The combination of these two units is the perfect setting while using a small footprint on jobsite. For example the units are very convenient in transport. Because of the hook arm system. So an expensive tele crane is no longer needed. The R2000E easily slides on the ST1200E. Making the set up quick, easy and safe. Discover more about the recycling unit R2000E and storage unit ST1200E.